Custom steel fabrication ยท Melbourne’s East
Mon–Fri [hours]0406 776 186
0406 776 186 Get a Free Quote
Automation

Gate Automation

Motor and control systems fitted to new or existing steel gates across Melbourne's East.

Home › Services › Automation
Get a Free Quote   ☎ Call 0406 776 186
Gate automation adds a motor and control system to a sliding or swing gate so it opens and closes without being pushed or pulled by hand. Adonai Steel Fabrications fits automation to new gates at the fabrication stage, or retrofits it to an existing steel gate, across Melbourne’s East.
What we build
Automation — built to fit
  • Automation for new sliding and swing gates, designed into the frame from the start
  • Retrofit automation for existing gates
  • Safety-sensor and access-control options
Gate Automation, Melbourne's East
Automation
See the work
Automation we’ve built

A selection of recent automation jobs across Melbourne’s East — every one measured on site and fabricated to fit.

Automation project in Melbourne’s East by Adonai SteelAutomation project in Melbourne’s East by Adonai SteelAutomation project in Melbourne’s East by Adonai SteelAutomation project in Melbourne’s East by Adonai Steel
View the full gallery →
Automation in the field
Real automation we’ve fabricated and installed across Melbourne’s East.
Get a Free Quote
Why choose Adonai Steel
Fabricated to fit, by a local shop

We assess the gate and posts on-site before automating, rather than fitting a motor to hardware that isn’t rated for it.

New gates can be designed around automation from the start, cutting down on future retrofitting.

15+ years of steel fabrication experience means we know when a gate isn’t ready for a motor yet.

Proud member of Master Builders Victoria.

New vs retrofit
Automating a new gate vs an existing one

Automating a gate at the time it’s fabricated means the frame, hinge posts or track are built to suit the motor’s mounting points and safety clearances from the start. Retrofitting automation to an existing gate is possible in most cases, but the gate and posts need to be assessed on-site first to confirm they can safely carry the motor and daily cycling. See our Gates page for gate options.

Our process
How we build it
01

Assess

We assess the gate (or planned gate) — weight, frame condition, posts and available power.

02

Fit

We fit the motor, control system and safety features appropriate to the gate.

03

Test & hand over

We test the installation and hand over, including your remote or access setup.

FAQs
Common questions
Can any gate be automated?

Most steel gates can be automated, but the gate’s weight, frame condition and post strength need to be assessed on-site first, since the motor and daily operation put more load on the gate and posts than manual use.

Ready to talk through your project?

Tell us what you need and we’ll come back with a straightforward quote — no call centre, no guesswork.

☎ CallGet a Quote